#276 | (7) Mobile Construction Road from Securatek for pipe rehabilitation or sewer rehabilitation of a...
At Stuttgart Airport, a defective pipeline on a combined storage tank had to be replaced. In the heavily softened meadow, ruts were to be avoided as far as possible, nor were the vehicles and machines allowed to get bogged down in order to avoid disrupting flight operations through recovery.