Start / References / Temporary road at Elisabeth Hospital in Ratingen
If an important Access is no longer possibleThings need to happen quickly. This was precisely the challenge facing Elisabeth Hospital in Ratingen. Instead of lengthy construction work, a uncomplicated interim solution chosen one that was ready for use in the shortest possible time. temporary makeshift road It not only ensures reliable accessibility, but also impressively demonstrates how efficiently such situations can be handled with Ground protection mats to be implemented by Securatek.
Extensive construction work at Elisabeth Hospital in Ratingen led to the following: Not usable via regular access roads were. However, visitors, employees and the emergency services still needed reliable and easily accessible access.
To ensure uninterrupted accessibility, a temporary makeshift road It was set up over adjacent meadow areas. The solution could be implemented without any earthworks and integrated immediately into the ongoing hospital operations.
The use of Ground protection mats enabled an extremely quick implementation the new path layout. The slabs were laid within a short time and formed a stable, weather-independent A route for cars and especially ambulances. Since the approximately 40 kg lightweight slabs are laid entirely by hand, the solution requires no machinery.
This ensures that the meadows and surrounding area remain undamaged, mud-free, and immediately accessible without ruts. Emergency routes could thus be seamlessly routed across the new temporary road, allowing the Emergency response guaranteed at all times was.
A key advantage of the temporary access road was its high adaptability. The altered traffic flow revealed the need for additional space for Oncoming traffic, parking zones and Shunting areas became necessary. The flexible system could be used at any time. seamlessly expand and precisely adapt to the actual traffic volume. Throughout the entire period, the route remained stable, load-bearing, and reliably passable.
The experiences at Elisabeth Hospital demonstrate, in an exemplary way, how effective a temporary access can be set up if a quick functional interim solution is needed.
On too construction sites, in Event logistics or for seasonal access roads The solution offers a reliable alternative to gravelled crossings. Depending on project requirements, it can be purchased or used as... Construction road rented can be.