
Save now!
Save in November 5% when you buy our products with up to 200 t load capacity MegaTrack PRO heavy-duty road plate with fully integrated connection technology and load-distributing overlapping lips.
Save in November 5% when you buy our products with up to 200 t load capacity MegaTrack PRO heavy-duty road plate with fully integrated connection technology and load-distributing overlapping lips.
Start / References / Creating a water-permeable riding arena with the BG30 ground grid
In this case, the customer had the problem that water was standing on the riding arena and couldn't drain away, making the arena muddy. Installing the BG30 ground grid allows the water to drain away. A nice before/after comparison can be seen. The before image shows a riding arena that's practically standing in water and is accordingly muddy.
After replacing the soil and installing the BG30 plastic ground grid, the riding arena is dry and free of mud. Rainwater/precipitation can drain freely through the ground grid. After this step, the ground grids can be filled with sand or riding sand, or overfilled to create a footing layer.
The features highlighted in blue lead to further suitable references.
